We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.
Production Cycles of Seamless Carbon Steel Pipe-CONTINENTAL STEEL CO.,LTD
BLOGS

Production Cycles of Seamless Carbon Steel Pipe

Sep 12, 2023

Production Cycles of Seamless Carbon Steel Pipe

Generally, production cycle of seamless carbon steel pipe depends on its production methods. The mainly processing methods for carbon steel seamless pipes are: hot rolling, cold rolling and cold drawn. If you want to know how long the production cycle of seamless carbon steel pipe is, please read on to learn more.

 

1. Hot Rolling
The hot rolling process is made by heating the steel billet to above 1000°C and undergoing rough rolling, finishing rolling and other processes. It is mainly suitable for the production of carbon steel and low alloy steel pipes, and can produce large diameter steel pipes. Generally, there is a minimum order quantity requirement, and the minimum order quantity of hot-rolled seamless steel pipe is relatively high. When the demand is low, production can be combined according to the production progress of different specifications in steel mills. For large-diameter hot-rolled seamless pipes, small orders of tens of tons mostly follow the production plan of the steel mill, and the production plan will not be arranged separately. The production speed of this product is fast. However, the production cycle of small batch orders is generally more than 20 days (the specific time needs to be arranged according to the production schedule).

2. Cold Rolling
Cold rolling is carried out at room temperature and rolled by a cold rolling mill to produce small-diameter seamless steel pipes. The surface of the inner and outer diameter of the steel pipe is bright, and the error is small. Large and small batches are suitable for customization, the processing speed is slow, and the production cycle is generally about 10-15 days (the specific time needs to be arranged according to the production plan schedule).

3. Cold Drawn
Cold drawn is a processing method to reduce the diameter of carbon seamless steel pipes, and is mainly used to produce small diameter steel pipes. The production quantity is flexible, the minimum order quantity is low, and both large and small orders can be produced. The outer diameter error of empty drawing is small and the surface is smooth, which is suitable for products with higher requirements on the outer diameter, but the inner diameter error is large. If there is a high error requirement for both inner and outer diameters, you can choose sandwich (inner diameter sandwich rod) for cold drawing. The production speed is fast, and the production cycle is generally about 7-10 days (the specific time needs to be arranged according to the production plan schedule).

As a professional seamless carbon steel pipe manufacturer and exporter, Continental Steel Co.,Ltd specializes in providing various specifications and materials, large inventory, rich experience, and can provide customized services according to customer requirements.

Casing Manufacturing Process

Benefits of steel sheet piles as construction material

Benefits of steel sheet piles as construction material

Posted: Nov 13, 2024
How to solve the problem of steel sheet pile corrosion in the soil?

How to solve the problem of steel sheet pile corrosion in the soil?

Posted: Nov 07, 2024
Methods for sheet piling installation

Methods for sheet piling installation

Posted: Nov 06, 2024
Precautions for the construction of steel sheet piles

Precautions for the construction of steel sheet piles

Posted: Oct 30, 2024
CONTINENTAL STEEL CO.,LTD

Continental Steel Co.,Ltd(CSC) is a pioneering manufacturer, stockist, and supplier of steel pipe products.

Get a Quote

Contact Us

CONTINENTAL STEEL CO.,LTD